Four rules. Twenty-three years. No exceptions.

Every practice has a manifesto. Ours is short because each line has cost us money at least once, and we kept it anyway.

A weathered concrete surface in raking light
Principle I

Permanence over novelty

A building should be more interesting at forty than at four.

We specify for the second half of a building's life. That rules out most of what is currently fashionable and nearly everything that relies on a sealed joint. What remains is a narrow, old palette — stone, concrete, brick, timber, patinating metal — chosen because its failure is gradual and legible rather than sudden and expensive.

An open covered ground plane beneath a building
Principle II

The ground belongs to the city

Whatever we build above, the street level is not ours to keep.

Every Aurelis project gives measurable ground-plane area back as public or semi-public space — unticketed, unlocked, and usable without buying anything. It is the part of a building that the most people will experience and the part that developers most reliably surrender to parking and service doors.

Structured shade falling through a perforated canopy
Principle III

Climate is the plan

Orientation, mass and shade before machinery.

Mechanical systems are the last resort, not the first move. Sun path, prevailing wind and thermal mass determine the plan before a single service is drawn. Four of our completed buildings have no mechanical cooling in their primary living spaces, in climates where that is supposed to be impossible.

A quiet studio with drawings pinned to the wall
Principle IV

Fewer, and better

Never more than four projects in design at once.

A self-imposed ceiling, held since 2004. It costs us roughly six commissions a year. In exchange, every project has a director who has stood on its site more than thirty times and can account for every significant decision made on it. We have not found a way to buy that with headcount.

Standing rules

The specification clauses we will not negotiate.

These sit in every contract we issue. Contractors are told at tender, not at construction, and pricing reflects them from the start.

  1. 01We do not use render, composite panel, or any sealed external joint.
  2. 02Every habitable room is within four metres of a window.
  3. 03Excavated material returns to the building wherever the geology allows.
  4. 04No project proceeds without a whole-life carbon model, not just an operational one.
  5. 05Formwork is designed to be reused as finish, not disposed of as waste.
  6. 06Public ground-plane area is a contractual deliverable, not a planning concession.
Dry-jointed stone coursing in low sun

Ask not whether a material looks good on handover day. Ask what it looks like after forty monsoons, and whether anyone will be willing to pay to fix it.

Ira Naravane, Founder

Enquiries

We don’t just build properties. We create landmarks.

We take on four projects at a time. If you are considering a site, a collaboration or a commission, the conversation starts here — and it starts with a real person reading it.